Compaq Confidential – Need to Know Required
Writer: Jennifer Hayward Project: Compaq ProLiant ML350 Generation 2 Tower-to-Rack Conversion Guide Comments:
Part Number: 236991-001 File Name: b-ch1 Preparing the Server.doc Last Saved On: 7/10/01 1:05 PM
Chapter 1
Preparing the Server
This chapter provides instructions to prepare a Compaq ProLiantä ML350
Generation 2 server to be mounted into a Compaq 19-inch-wide rack.
To mount the server into a rack, you need the following tools:
■ Torx T-15 screwdriver
■ Phillips screwdriver
Preparing the server involves the following steps:
1. Unpacking and identifying conversion kit contents
2. Powering down the server
3. Removing tower-specific chassis components
4. Installing rack-mountable-specific chassis components
IMPORTANT: As with any upgrade, be sure that you have created a backup of all your
data before you begin.
Comments to this Manuals